Nangerd Ballast MineNANGERDBahman InfrastructureDevelopment Group

Nangerd Ballast Mine

Bahman Infrastructure Development GroupIran’s largest ballast production group

Capacity exceeding 1.5 million tonnes per year, supported by domestic expertise, contributing to production, employment and the economy.

The mine

Andesite from the Nangerd mine,crushed into ballast, sand,gravel and base.

The operator estimates annual sales of 300,000 tonnes and, with the two active crusher lines on site, can produce more than one million tonnes a year.

Aerial view of Nangerd ballast mine
What we do on site
  • 01

    Extraction

    Stone is taken from the working faces of the mine.

  • 02

    Crushing

    Primary and secondary crushing on site.

  • 03

    Screening

    Material is screened into product sizes.

  • 04

    Inspection

    Product is checked before it leaves the site.

  • 05

    Loading

    Bulk loading from the stockyard.

  • 06

    Road and rail

    Dispatch on the date agreed with the buyer.

Figures

Nangerd mine reports.

0.0M+

tonnes

Confirmed reserve

0.0M+

tonnes

Estimated reserve

0.0M+

tonnes / year · three lines

Production potential

0+

tonnes / year

Licensed output

0+

hectares

Mine area

Figures from the mine's operating-licence extension plan (Winter 1403 / 2024–25). The reserve is the tonnage confirmed by the Ministry of Industry, Mines and Trade; production potential is the rated capacity of the two active crusher lines on site.

How the stone is prepared

From the quarry face to loading.

01

Extraction

Stone is taken from the working faces of the mine.

Extraction

02

Crushing

The rock is crushed once, then again, until it is the right size for screening.

Crushing

03

Grading

Screens separate the stone into the sizes needed for each product.

Grading

04

Product Control

Each load is checked against what was agreed in the enquiry.

Product Control

05

Loading

Graded stone is stockpiled and loaded in bulk.

Loading

06

Delivery

Loads leave by road or rail on the date agreed with the buyer.

Delivery
Weighbridge and truck access at Nangerd mine
Loading and dispatch

Nangerd Ballast Mine

Markazi Province, Ashtian County, km 50 of the Arak–Qom road, before Gandmazar, opposite Nangerd railway station.

Site
Ashtian County
Province
Markazi
Dispatch
Road / rail

Companies we work with.

A selection of the organisations that Nangerd supplies and partners with.

Islamic Republic of Iran Railways
Jahad Nasr, Markazi Province

Contact Nangerd Ballast Mine