Nangerd Ballast MineNANGERDBahman InfrastructureDevelopment Group
Rail-connected quarry stockyard loading a freight wagon

Infrastructure

A quarry beside the railway

Moving stone by road over long distances wastes payload on empty return trips and wears the highway. A rail-connected quarry loads where the product is made.

Nangerd

The mine sits opposite Nangerd station on the Arak–Qom road. Dispatch is by road or rail, on the date agreed with the buyer.

Measure the whole delivery

Compare truck-only and rail dispatch by loading time, route distance, axle or wagon capacity, trans-shipment risk and site access. The best mode is the one that delivers the specified tonnes when the possession is open, not simply the one with the lowest price per kilometre.

Plan stock and slots

Rail supply works when the quarry, operator and project share a loading window, wagon plan, product segregation map and contingency for weather. A clean pad beside the siding lets the plant build a buffer without mixing sizes or blocking the next train.

All articles